The Connection Date Assumption: Budgeting Electrification Against a Constrained Grid
Electrification plans often treat the grid connection date as a scheduling detail rather than a budget variable. With distribution network operators quoting longer timelines and higher reinforcement costs, 2026/27 plans need a practical audit of queue position, interim fuel costs and phased connection options.